Operations · the part vendors under-sell
Mass in = oil + char + gas + leaks

Pyrolysis Yield

Management

Run it like a chemical plantNot a bonfire with a lid

Direct answer

How do you manage pyrolysis?

Treat it as a sealed thermochemical reactor with a defined atmosphere, a defined vapour fate, and a mass balance that closes. The kiln is 30% of the plant. The other 70% is feed prep, inerting, quench or oxidiser, scrubbers, char cooling, and instrumentation.

1. Feed

2. Atmosphere

Purge to < a few percent O2 before heat. Run under N2 or recycled non-condensable gas slightly below atmospheric (Biogreen documents “below atmospheric”) so leaks go in, not out — unless you have a designed oxidiser draft. Measure O2, CO, and pressure. A positive-pressure hatch is how workers meet pyrolysis vapour.

3. Pick one fate for vapour

If you want…Vapour pathSetpoints
OilHot out → quench condenser → oil tank → non-condensables to burnerVapour seconds, not minutes. Avoid 600 °C freeboard.
Char + heat (sludge, PFAS)All vapour to thermal oxidiserOxidiser ≥850–950 °C, then fast quench. Steam helps PFAS mineralisation.
Battery HF controlClosed duct → lime/caustic scrub → stackNever a charcoal filter as the only HF barrier.

4. Scrub what the chemistry will make

5. Solids out

Char, rCB and black mass are hot and often still reducing. Cool under inert below the auto-ignition window before air. Water-jacketed screws are standard. A char fire in a skip is a common first-year incident. For sludge biochar, metals concentrate (the mass shrinks); check exceptional-quality ceilings, not just PFAS.

6. Oil, if you make it

Phase-separate water. Filter char fines. For plastic oil, plan hydrotreating or a steam-cracker spec (Plastic Energy / Shell / Technip-class upgraders exist because raw PPO is not diesel). Tire oil is a BTEX and sulphur problem as well as a fuel. Do not put raw PPO in a truck tank and call it circular.

7. Close the balance

Weigh feed, oil, char, and gas (or oxidiser duty as a proxy). Target 95%+ closure. The missing 5–15% in vendor trials is usually water, leaks, or “gas we did not meter”. For PFAS, close fluorine, not just C8 analytes.

8. Instrumentation that pays for itself

If those five are not on a historian, you do not have a process. You have a heated drum.